Benchmark Exercise on Safety Engineering Practices

Akronyymi

BESEP

Rahoitetun hankkeen kuvaus

The objective of BESEP (Benchmark Exercise on Safety Engineering Practices) is to support safety margins determination by developing best practices for safety requirements verification against external hazards, using efficient and integrated set of Safety Engineering practices and probabilistic safety assessment. The benchmark exercise will: - Define a benchmark baseline on safety requirements important for the licensing of nuclear power plant new builds and upgrades. - Collect and group case studies on safety analysis of external hazards previously performed by the project partners. - Perform comparison of case studies and generalized case study groups from viewpoints of safety margins determination, requirements verification, level of details in safety analysis and realism in quantification of safety margins. - Evaluate possible successes and challenges of the applied Safety Engineering processes. - Evaluate resilience of safety margins in case of design-basis exceeding external hazards. - Evaluate the balance between the allocated analysis resources and the plant level risk significance of different external hazards using results from probabilistic safety assessments. - Disseminate results to the nuclear community taking into account both senior and junior technical experts as well as managers and policy makers. The main outcomes of BESEP will be: - Best practices for the verification of evolving and stringent safety requirements against external hazards - Guidance on the closer connection of deterministic and probabilistic safety analysis and human factors engineering for the determination and realistic quantification of safety margins. - Guidance on the creation of graded approach for the deployment of more sophisticated safety analysis methods, such as upgrades of simulation tools, while maintaining the plant level risk balance originating from different external hazards.
Näytä enemmän

Aloitusvuosi

2020

Päättymisvuosi

2024

Myönnetty rahoitus

775 523.75 €
Coordinator
Fortum Power and Heat Oy
302 422.5 €
Participant
RELKO SPOL SRO (SK)
289 575 €
Participant
RISK PILOT AB (SE)
405 750 €
Participant
NUBIKI Nuclear Safety Research Institute Ltd. (HU)
324 275 €
Participant
UJV REZ, a. s. (CZ)
291 280 €
Participant
ELECTRICITE DE FRANCE (FR)
370 875 €
Participant

Myönnetty summa

2 759 701 €

Rahoittaja

Euroopan unioni

Rahoitusmuoto

Research and Innovation action

Puiteohjelma

Horizon 2020 Framework Programme

Haku

Ohjelman osa
Euratom (5421)
Indirect actions (5479)
Aihe
Safety margins determination for design basis-exceeding external hazards (NFRP-2019-2020-03)
Haun tunniste
NFRP-2019-2020

Muut tiedot

Rahoituspäätöksen numero

945138

Tunnistetut aiheet

nuclear safety, nuclear reactors