Lowering Costs by Improving Efficiencies in Biomass Fueled Boilers: New Materials and Coatings to Reduce Corrosion
Akronyymi
BELENUS
Rahoitetun hankkeen kuvaus
The primary objective of BELENUS is to lower bioenergy CAPEX and OPEX by an average of 5 and 60% respectively. This will be addressed by preventing or mitigating corrosion as the main limiting factor through a holistic approach to prevent corrosion in the boiler, in particular in superheater (SH) tubes: a) new surface engineering: biomass corrosion highly resistant coatings on creep resistance materials; b) new strategies of welding and bending for coated tubes improving the quality and efficiency of boiler components; and c) new online corrosion monitoring system specifically designed for biomass CHP plants. In addition, the BELENUS solution will impact on other LCOE parameters by improving efficiency in the conversion (up to 42%), increasing a 5% the operational hours of the plant and plant life time (5 years) and reducing the fuel expenditure of the plant by optimising its use and providing flexibility by allowing the use of different types of biomass. Improved performance for high temperature material systems through the technological breakthroughs, will be evaluated and validated an innovative test protocol. Finally, modelling and lifetime prediction tools will be developed and cost analysis and Life Cycle Analysis (LCA) undertaken so the optimum materials and coatings are chosen from the durability, economic and environmental perspectives, maximising the sustainability in economic and environmental terms. BELENUS brings together a multidisciplinary consortium comprising the main stakeholders with leading utilities, steel and tube developers, boiler designer and specialized research institutions from across Europe. This synergy allows a direct transfer of results in TRL5 to be obtained in BELENUS as technical base to go further to higher TRL into commercial biomass electric power plants within less than 5 years.
Näytä enemmänAloitusvuosi
2019
Päättymisvuosi
2024
Myönnetty rahoitus
UNIVERSIDAD COMPLUTENSE DE MADRID (ES)
841 917.96 €
Coordinator
SANDVIK COROMANT AB (SE)
203 500 €
Participant
ZABALA INNOVATION CONSULTING, S.A. (ES)
185 000 €
Participant
EIFER EUROPAISCHES INSTITUT FUR ENERGIEFORSCHUNG EDF KIT EWIV (DE)
158 590 €
Participant
UNIPER TECHNOLOGIES LIMITED (UK)
360 976.25 €
Participant
TECNOLOGIA ENGENHARIA E MATERIAIS SA (PT)
120 250 €
Participant
INSTITUTO NACIONAL DE TECNICA AEROESPACIAL ESTEBAN TERRADAS (ES)
599 395.01 €
Participant
CENTRO DE INVESTIGACIONES ENERGETICAS, MEDIOAMBIENTALES Y TECNOLOGICAS-CIEMAT (ES)
400 508.75 €
Participant
ALLEIMA TUBE AB (SE)
203 500 €
Participant
ELECTRICITE DE FRANCE (FR)
84 750 €
Third party
RWE POWER AG (DE)
146 263.75 €
Participant
TECHNISCHE UNIVERSITAET MUENCHEN (DE)
653 102.81 €
Participant
CHALMERS TEKNISKA HOEGSKOLA AB (SE)
600 450 €
Participant
Myönnetty summa
4 991 324 €
Rahoittaja
Euroopan unioni
Rahoitusmuoto
Research and Innovation action
Puiteohjelma
Horizon 2020 Framework Programme
Haku
Ohjelman osa
Energy (5352 Low-cost, low-carbon energy supply (5357 )
Aihe
Developing solutions to reduce the cost and increase performance of renewable technologies (LC-SC3-RES-11-2018Haun tunniste
H2020-LC-SC3-2018-RES-TwoStages Muut tiedot
Rahoituspäätöksen numero
815147
Tunnistetut aiheet
biomass, bioeconomy, biorefinery, biofuels, biogas